How to install roll up garage door tracks 1.
Garage door installation track level.
The bottom of the track must be equal to the bottom of the section.
Adjusting the tracks for a binding garage door step one.
Using a rubber mallet tap the bottom of the track so it is perfectly.
The rail on the opener should be slightly higher in the front and about 2 3 inches above the door when the door is open.
If not level raise the lower track but not higher than 3 8 from the floor figure 7d.
Vertical tracks must be plumb as well.
Place the hinges.
Attach the brackets for the cable to the bottom door panel following the manufacturer s instructions regarding the.
Unless you have a carriage style garage door your garage door will have two door runs that move from the floor to the ceiling.
The door runs are housed in a garage door track one on each side of the garage door.
This second track is installed above the horizontal section that is attached to the curve from the vertical track section.
Adjusting the track position.
If you have a regular door opener that is mounted above you door then the tracks should be level.
Maintain 3 8 space between the door edge and the vertical track figure 7c.
If the garage door is secured in the tracks loosen the screws with the help of a screwdriver which will bind the tracks in the garage door frame.
This very common garage door track option uses up even less headroom space than a 12 radius track.
So if they drop the horizontals make sure they drop the opener too.
Install the weatherstripping onto the bottom edge of the bottom door panel.
Vertical tracks must be level with each other for the door to function properly.
Then they ll go horizontally parallel to the garage ceiling and floor.